A proper roof inspection is a walk on the roof and a look through the roof space, with every ridge, valley, flashing and wet corner named. A driveway photo is a start. It is not the inspection. Roof Revival Melbourne writes the scope after that visit. The report says restore, repair, or replace, and it says why.

The short version

People book an inspection when a ceiling has stained, a buyer’s report has used a hard verb, or a quote has arrived that nobody can picture. The useful visit answers four things. Is the tile or sheet still sound. Is the water path failing at a point or across the field. Is the timber and sarking dry. What work, listed in lines, would actually stop the problem. Anything sold as an inspection that never leaves the ground has skipped the roof.

Roof Revival Melbourne treats the inspection as the product that comes before the quote. We are not pricing a suburb average from the footpath. Two-storey hips in Doncaster, low-pitch metal in Point Cook, and terracotta terraces in the inner north fail in different places. The checklist is the same. The findings are not.

On the roof, not from the nature strip

The first hour is the outside. We look at pitch, storeys, and how a ladder or scaffold actually lands. We walk the field where it is safe to walk. We count cracked, slipped, and broken tiles instead of writing “some breakage”. We press the ridge and hip bedding. Powder that falls away in your fingers is a failed bed, even when the colour on top still looks even. We look at every valley iron, not the one you can see from the downpipe. We look at chimney aprons, skylight curbs, vent penetrations, and the apron where a lower roof dies into a wall.

Metal roofs get a different pass. Screws, laps, and ridges tell the truth. A coating that has chalked is a surface note. A screw that has lost its washer, or a sheet that has rusted through at the end lap, is a leak path. We do not condemn a lid because it is dull, and we do not pass a lid because it is new. Young Colorbond fails at details. Old tile fails at mortar and at the units themselves.

Gutters are in the same walk. We note holes in the sole, rust at the internal corners, and overflow marks on the fascia. A blocked gutter is a maintenance fact. A holed gutter is a replacement fact. We say which one we are looking at. We do not turn the inspection into a flush tutorial.

In the roof space, where the stain started

The ceiling mark is the symptom. The roof space is where you see whether the sarking is stained, whether the battens are soft, and whether daylight is showing through a gap the tiles hide from above. We look above the room that has the mark, and we look one bay either side, because water runs along a batten before it drops. A dry ceiling under a wet valley can be luck and timing. A wet corner in June, inspected in February, still leaves a tide line.

Sarking that has perished across whole bays is a different finding from a single drip. Insulation that is soaked gets noted because it stops doing its job and because it hides the timber. We are not selling you a new blanket as the repair. We are saying the blanket is evidence. If the framing is affected, that goes in the notes before anyone talks about a coating colour.

Access inside matters as much as access outside. A manhole in a wardrobe, a low hip that you cannot crawl, and a roof space full of stored boxes all change what can be seen on the day. We write “not sighted” when we cannot see it. We do not guess a bay we did not enter and then price it as fact.

What gets written down

The inspection becomes a scope, or it becomes a reason to leave the roof alone. A useful page names the material, the age band if it is obvious, the failures, and the work. Re-bed and repoint, with the ridges included. A tile allowance, with a count or a clear provisional method. Valley replacement, if the iron is holed. Flashing repairs, named by the penetration. Prep and a specified coating, if the body of the tile is still hard. Replacement, if the field is finished. Each line is something you can point at on a photo.

Photos are part of the inspection, not a courtesy. The open bed, the cracked unit, the rusted lap, the stained sarking. You should be able to hold the quote against the pictures a month later when a second company has described a different roof. If the pictures and the words disagree, the inspection is not finished.

The service that sits under this article is a roof report for a building inspection in Melbourne. Bring the buyer’s report if you have one. We read the verb they used, then we check it on the roof. Sometimes the template overreached. Sometimes the template was the kindest sentence on the page.

What an inspection is allowed to conclude

Three endings are honest. Repair, when the failure is local and the rest of the lid is sound. Restore, when the tile body and the timber still have life and the ridges, the broken units, and the face need to be done as one system. Replace, when the field, the underlay, or the sheet is finished and a coating would be paint on a write-off. A fourth ending exists and we use it: no work, when the roof is dirty or the stain is a gutter overflow. That ending saves you money. It should be available to the person on the roof.

We will not stretch a local leak into a full restore to fill a week, and we will not shrink a finished field into a restore to win the quote. The building-inspection replace note is a common reason people call. The inspection we do is allowed to disagree with it, in writing, with photos.

Limits belong on the page too. We do not core the tile. We do not x-ray the battens. We do not certify electrical work, gas flues, or the structural design of a truss we have not been asked to engineer. If we see something that needs another trade, we say so and we stop at the edge of the roof. Cement sheet is one of those edges. We do not remove it, and we do not describe how anyone else should.

How Melbourne houses change the same checklist

An 1980s concrete tile roof in Glen Waverley or Box Hill usually fails first at the bedding. The units can still ring hard. The inspection spends its time on hips, ridges, and valley irons, then on whether a coating is even relevant. A Camberwell or Kew terracotta roof adds a matching question: are the units still made, and does the streetscape want them to stay. A Point Cook or Tarneit metal roof often has nothing wrong with the sheet and everything wrong with a flashing, a skylight curb, or a gutter that overflows onto a low eave.

Inner terraces add access. A narrow sideway, a party wall, and a roof you cannot see from the street mean the inspection must say how the job would be done, not only what is wrong. Two-storey work changes the price because it changes the hours. If the inspection never mentions height, the quote that follows is guessing.

Season changes what you can prove. A roof inspected after three dry weeks may show the scar and not the drip. We still record the scar. We do not wait for a perfect storm to believe a valley that has already stained the ceiling twice.

What you can send before we arrive

Suburb, storeys, and two photos get the booking pointed at the right job. A building report, a quote you do not trust, and a photo of the ceiling stain make the hour on site sharper. They do not replace the hour. We would rather see a bad photo than a long description of “the left side”. Left of what, from the street or from the back door, is how leaks get written onto the wrong bay.

If you are comparing two inspections, compare what was entered. Roof space or not. Ridges photographed or described as “OK”. Valleys named. A one-page letter that says the roof “requires attention” is a sentence, not an inspection. The next article in this family, on how to read a report, is for the document you already hold. This one is for the visit that should have produced it.

Typical inspect

  1. 1. Walk the roof and photograph the failures
  2. 2. Enter the roof space above the stain and the neighbouring bays
  3. 3. Separate a local repair from a tired field
  4. 4. Write restore, repair, replace, or no work
  5. 5. Price only the lines the photos support

Related pages

Questions

It is enough to book the visit. A proper inspection is on the roof and in the roof space, with ridges, valleys, flashings and sarking recorded. The price follows that, not the suburb.
No. If the roof is sound and the stain is overflow or dirt, the honest result is no roof work. Repair, restore, and replace are the other three endings, and only one of them should be on the page.
Yes. Bring the report. We check the lines on the roof. Sometimes the wording overreached. Sometimes the roof is finished and the report was right.
Electrical, gas, and structural engineering. We also do not remove cement sheet or describe how to take it off. If another trade is required, the note says so.

Next step

Send suburb, storeys and two roof photos. Roof Revival Melbourne — 0426 516 883 · info@roofrevivalmelbourne.com.au