Key takeaways
- Replacement starts by proving the old roof is finished, or that the owner is choosing metal with their eyes open.
- The inspect measures pitch. Tile-to-metal jobs inherit a fall that suited tiles, which is usually enough for corrugated sheet, and sometimes more than a low-pitch profile needs.
- New sheet changes the drip line. Gutters sized and hung for tiles may be rusted, undersized, or simply in the wrong relationship to the new edge.
General guidance for Melbourne roofs. The written scope after an assessment decides the work.

The roof you have, not the roof in the listing photo
Replacement starts by proving the old roof is finished, or that the owner is choosing metal with their eyes open. The inspect has to be on the roof. We look at tile bodies if the house is tiled, and at sheet, screws and laps if it is already metal. A concrete field that is still hard, with failed ridges, may be a restore in the $4,000–$12,000 band for a standard home. Stripping it because a brochure prefers steel is a preference. We will price the preference. We will not pretend the inspect found a dead roof. The replacement path we specify, when steel is the decision, is Colorbond roof replacement in Melbourne.
Where the roof space can be entered safely, we go in. Daylight through a lap, a wet line on sarking, a batten that crumbles, a ridge board that has dropped: those change the scope before a colour is chosen. Fastening new sheet to timber we would not trust is how a new roof leaks in the first winter. If a carpenter has to sister a rafter or replace a fascia, that work is named. It is not absorbed into the word “replacement”.
Pitch, profile and the water path
The inspect measures pitch. Tile-to-metal jobs inherit a fall that suited tiles, which is usually enough for corrugated sheet, and sometimes more than a low-pitch profile needs. Rear skillions are the trap. A drawing that says three degrees and a roof that has settled to something flatter will not be saved by a famous brand. We match the profile to the fall we measure. Valleys, box gutters and the way water leaves a split-level roof are drawn in the notes. A hip-and-valley count from the street misses the internal gutter you only see from the upper storey.
Penetrations are listed one by one: flue, skylight, whirlybird, solar feet, evaporative unit, antenna. Each needs a flashing that belongs to the new profile. “Make good penetrations” is not a seeing. We see them. Solar comes off in the sequence and goes back when the new fixings can carry it. If another trade owns the array, the inspect says who isolates it. A replacement quote that is silent on panels has not seen the roof the household actually lives under.
Edges, gutters and the frame at the eave
New sheet changes the drip line. Gutters sized and hung for tiles may be rusted, undersized, or simply in the wrong relationship to the new edge. The inspect looks at fall, outlets and whether the fascia can hold a new gutter. Barges and aprons are the same visit. A beautiful field of new sheet draining into a gutter with no outlet is a wet eave with a fresh roof above it. We include gutters when they need replacing. We say “existing gutters remain” when they are sound, so nobody assumes they were in the price.
Two-storey houses in Doncaster, Templestowe and similar streets must be seen for access, not imagined. Scaffold, anchors and the way we land old tiles are part of what the inspect records. A single-storey hip in a wide side yard is a different replacement from a steep roof over a pool. The common planning start, about $20,000 for a standard home, moves as soon as those conditions show up. That is the point of looking.
Street rules, asbestos and what we refuse to guess
The inspect includes the street. An overlay or a character control can refuse a metal lid on a tile or slate house. We do not order steel and hope. If the answer is a planner’s, we say so and pause. A heritage colour on a steel sheet is still steel. Neighbours who already changed materials are a clue to ask, not a permit.
Old eaves, garages and some roof sheeting can be asbestos cement. The inspect identifies the suspicion. It does not become a removal guide. A licensed removalist handles that material, and the replacement quote waits on that limit. We also will not guess insulation, sarking brand or a colour from a faded real-estate picture. Unseen items stay off the firm number or sit as allowances with a reason. Roof Revival Melbourne would rather book a second half-hour on the roof than invent the valleys.
What you can send before we arrive
Suburb, storeys, and whether the roof is tile or metal now. Two photos from the ground, plus any ceiling stain. Mention solar, a recent building report, and if you already know an overlay applies. Clear the side access if you can. We still measure. Your photos get us to the right question faster. They do not replace the frame, the pitch or the gutter line.
After the inspect you should be able to read profile, colour as a proposal, sarking, battens, flashings, gutters in or out, solar sequence, and the reason replacement won over a restore or a repair. If those lines are missing, the inspect was a visit, not a seeing. Ask for them before anyone orders a pallet. The steel is the easy part to buy. The roof is the list of things the inspect refused to skip.
Typical replacement inspect
- 1. Walk the roof and the roof space where it is safe
- 2. Measure pitch and list valleys and penetrations
- 3. Check fascia, gutters, solar and access
- 4. Check overlay limits and any asbestos suspicion
- 5. Write replacement, or a restore if the old roof still has life

