Key takeaways
- A replacement has a calendar before anyone lifts a tile, and a run of days once the roof is the job in front of the crew.
- The covering should be specified, not “something metal” or “tiles, we’ll see.” Profile, colour where the street or an overlay cares, and sarking are decisions for the quote, because changing them on the morning of the strip…
- Once the start is real, the order is what protects the house.
General guidance for Melbourne roofs. The written scope after an assessment decides the work.

Two clocks, and only one of them is on the roof
A replacement has a calendar before anyone lifts a tile, and a run of days once the roof is the job in front of the crew. Materials, scaffold, solar isolation and any approval sit on the first clock. Strip, underlay, battens where they are tired, the new covering, flashings and making good sit on the second. Owners usually ask about the second and get caught by the first. Roof Revival Melbourne writes both. A start date that ignores a tile or sheet lead time is a date, not a program.
The job those days belong to is roof replacement in Melbourne. On a normal house with the materials already chosen and access solved, the on-site work is often a short run of days rather than a month of scaffolding as a lifestyle. Steep pitches, two storeys, a roof that opens onto tired timber, and a complex of valleys stretch that run. Planning money commonly starts around $20,000 for a normal house and moves with squares, storeys and what is found underneath. The calendar is not a function of that starting band. A dearer, more awkward roof can take longer than a simpler one. We say which roof yours is after we have been on it.
What has to be true before the old roof comes off
The covering should be specified, not “something metal” or “tiles, we’ll see.” Profile, colour where the street or an overlay cares, and sarking are decisions for the quote, because changing them on the morning of the strip wastes the only dry window you had. Flashings, valleys and gutters need the same treatment. If they are in the scope, they are in the order of work. If they are excluded, you should already know the old ones are staying and why. Discovering the gutter on day two is how a three-day roof becomes a week of waiting on metal.
Access is a precondition, not a detail. Two-storey fronts in Balwyn, Doncaster or the inner east may need scaffold booked before the strip, and the scaffold day is part of the length even though no tile has moved. Terraces with a lane and nowhere to put a skip need that plan before the covering comes off, or the job stops with the roof open, which is the worst possible pause. Solar has to be isolated by the right trade and timed so the bays under the array are not an afterthought. We do not describe how you might lift panels yourself. We put the sequence on the page so the roof is not waiting on a guess.
Approvals, where they apply, sit on this early clock and can be longer than the roofing days. A straight replacement of like with like on a roof that does not trip a planning control is a different calendar from a heritage street where the material or the look has to be accepted before anything is stripped. We do not start a strip while that question is open. A program that shows “week one: new roof” and hides a permit nobody has lodged is a program for a different house. Ask which approvals the quote assumes are already done, and which ones are still in front of you. The honest duration includes them.
The days the roof is actually being replaced
Once the start is real, the order is what protects the house. The roof comes off in a sequence that can be covered again, not as a single dramatic clearance of every plane because the skip is there. Sarking goes on as the scope describes. Battens are replaced where the inspection put them in the scope, or where opening the roof proves they are no longer a batten. The new covering is fixed, then the details that stop the water: ridges or caps, valleys, aprons, soakers, penetrations. Gutters that were included go on while the edge is still the work in front of the crew, not on a vague return visit.
Weather gates this sequence harder than it gates a restore, because there are hours when the old covering is gone. We watch the forecast and we do not strip a plane we cannot responsibly cover because a booking feels committed. A lost day before a strip is cheaper than a wet ceiling. If rain arrives halfway, the program says what is protected and what waits. You should hear that in plain language on the day, not as a shrug. Melbourne in spring and early summer is perfectly capable of a hail cell on a roof that was clear at breakfast. The timeline has to have a way to stop.
This is trade work from the first tile to the last fixing. There is no safe version in which the household strips the easy planes over a weekend and a crew “finishes the fiddly bits.” That split is how underlay, laps and flashings get invented by whoever is tired on Sunday. The duration you are buying includes the details. A quote that is short because the details are missing will also look short on site, right up until the first rain finds the apron that was never in the program.
What adds days without adding mystery
Tired framing adds days, and it should add them in writing. If the inspection already showed soft battens under a valley, that timber is in the scope and in the timeline. If the roof is opened and a bay is worse than the photos, the work stops long enough to record it and price it. That pause is a variation, not a failure of the original duration. Pretending every rafter will be perfect is how programs look brave and invoices look surprised. We would rather name an allowance for unknown timber than discover the house has been open for an extra day with nobody authorised to proceed.
Complexity adds days in a way you can see from the ground. A simple hip in a growth-corridor estate, one plane of metal, easy driveway, is a shorter site than a Hawthorn or Kew roof with dormers, chimneys, several valleys and a street face that has to match a profile. Tile supply for an unusual terracotta can insert waiting before the start. Steep pitches slow every pass. Two storeys slow every pass. A roof that is large in squares but low and simple can still be quicker than a smaller roof that is all hips and height. Ask which of those you are. The answer should match the shape you live under.
Other trades add days when they are real and invisible when the quote forgot them. An electrician for solar. A plumber if a roof penetration or gutter outlet is part of the leak. Scaffold delivered and collected. None of these need to become a long project if they are booked in the order the roof needs. They become a long project when the covering is on and someone realises the flashing at the solar feet was never assigned. Read the program for names other than the roofing crew. Silence is not the same as “not required.”
Living through the site days
Many houses stay occupied. Expect noise, dust in the roof space, and rooms you may not want to use under the plane that is off. Cars move. Pets stay off the site. Ceiling stains that exist before the start should be photographed so a mark from 2019 is not blamed on the strip. The exposed days are the ones to know in advance. If we can keep those to a tight part of the program, we will. We will not promise a silent replacement. A new roof is a construction site that happens to be your house.
Inside work you are planning, painting, plaster, a sale, should sit around the roof program rather than on top of it. Plastering a ceiling the week the covering comes off is how a stain becomes a dispute. If settlement is close, say so before the strip is booked. Sometimes the honest answer is that the roof can be done in the window. Sometimes the honest answer is that materials or weather will not make a ceremony on Thursday safe. We will not strip on a bad forecast to protect a settlement and then point at the contract. The program moves, or the settlement conversation happens with the roof still on.
What finished means
Finished is the covering, the underlay, the flashings and the other lines, photographed, with the site clear enough to match what was promised. It is not the moment the last sheet is screwed if the valleys are still the old rusty ones that were supposed to be replaced. It is not a colour you like from the street while penetrations are still smeared. Walk the ground. Look at chimneys, skylights, solar feet and the gutter line. Look in the roof space at the new underlay where you can do that safely from the manhole. Ask for the same planes in the handover photos that were in the inspection.
A duration that ends when the skip leaves, with a list of “we’ll swing past,” is a duration that hid the details. Those return visits are still the job, and they should have been days in the original program or written variations. Roof Revival Melbourne would rather the last day be the details than a cheerful exit and a leak at the apron. Replacements often start around the planning figure people have heard, and they finish when the lines finish. Let the days follow the lines. A short program for a complete scope is a good program. A short program for a missing scope is the expensive kind of quick.
Typical replacement program
- 1. Lock covering, details, access and any approval
- 2. Book materials, scaffold and solar so the start is real
- 3. Strip and cover in a sequence the weather can survive
- 4. Complete flashings, valleys, gutters and penetrations in the scope
- 5. Handover photos of the planes and the details